There are numerous ways certain builder's can rip off their clients. Some things we strongly feel that all owners should be aware of are listed below ;
- PC
ALLOWANCES. This is an allowance for an item that cannot
be costed exactly. For example Kitchen cupboards, supply of tiles or
bathroom fittings, site works, etc. Some PC allowances may be unavoidable
but a tender should NOT have PC allowances for basic items such as frames
& trusses, windows, roofing and alike. The best quotes have little or
no PC allowances so that costs cannot increase during construction and
will closely remain within the desired budget.
- UNREALISTIC
PC ALLOWANCES. If a PC is to be included it should be a
realistic figure. There may need to be an element of trust between the
owner & builder in estimating this amount of PC allowance.
- UNQUOTED
VARIATIONS. Most variations can be quoted for before any
work is completed. However if in the rare case it cannot be quoted (eg
replacement of termite damaged timber) the variation needs to be proved by
supplying a copy of any material purchase invoices to the owner plus a
charge for labour at an agreed rate and a builder percentage for overheads
and profit
- CONCRETE
PIERING. Any concrete piering should be completed at
an agreed rate. The owner should inspect the amount of pier holes
completed to ensure they have been charged for the correct amount of
piering completed. The builder is the only person who usually keeps a
record of the amount of concrete piering that has been actually completed
on site. The engineer or council does not usually record the depth of pier
holes drilled on site. We strongly recommend that the owners attend the
site while measuring the depth of piers. Most bigger housing companies
will not allow you to be on site.
- ROCK
EXCAVATION. This can be expensive and should be
completed at an agreed rate of charges of machine hire, float charges,
truck hire, tip fee's that might be required.
- GST.
This can be double charged. Owners should ensure any invoices clearly
state whether GST is included or not. The builder can easily double charge
for GST on the sub-contractors invoice and then again on his invoice to
the owner if it is not clearly checked.
- LABOUR
RATES. These should be fair and reasonable. It is
common for many builders to include excessively hire labour rates for any
extra work that may be required. All labour rates would be clearly stated
in the building contract or tender so that the owner knows exactly what
labour rates will be charged for if required.
- EXLCUSIONS.
Builders can make more money by excluding an item rather than completing a
variation by not passing on the full amount of any excluded item in the
contract to the owner when an item is deleted. If the owner is thinking of
excluding an item during construction they should ask the builder to
include what the credit amount would be in the contract prior to contract
signing.
- TENDER
VALIDITY. All good builders will state in their tender
how long their tender is valid for before they can revise it for industry
rise and fall. This is usually between 30 and 90 days. WRITTEN
INCLUSIONS. Owners should insist that all of their requirements are
included in the tender in writing. If it is not written in the tender the
owner will have no legal right to claim for the inclusion. The tender
should be attached to the contract and signed by both parties with a copy
for each party supplied.
The most important element will be communication & trust between both parties. The above are only a few of the ways builders can rip off their clients. Owners should check the builders experience, check references and evaluate the builder not only on price but also on professionalism. - HOUSE SQUARES. House
squares should not be calculated including the eaves areas. A lot of builders,
mainly project home builders include the eaves area in the house squares
to make the size of the house look more appealing - automatically people
assume that there house is a lot bigger than it really is. The eave areas
should not be included in the house squares or square meters and should
not be charged for as the cost of this area should already be included in the square meter
rate excluding the eaves calculation.
In Construction inspection of equipments is also necessary.
ReplyDeleteFibreglass ladders for Sale
Good post! Thanks for sharing this information I appreciate it. God bless!
ReplyDeleteconstruction insurance, boston ma